docs docs/v1-publication-closeout #1 / 1
7 days ago · Oct 10, 2026 · Diff

docs: reconcile v1 prerelease publication and operating guides

sha256:f88ec0083b3bcac6a4b7b99c8cc196194ef376aab2c4f2f63e8dfe26256ac6b7 sha
+45 ~12 −85 symbols
12 changed · 865 in snapshot files
sha256:d62d1654471530cad66aa3ae3b1a5be3e9e78eeafedcf7de5629eac06ecc038f snapshot
+45
symbols added
~12
symbols modified
−85
symbols removed
12
files changed
865
files in snapshot
0
dead code introduced
Semantic Changes 142 symbols
+ Bounded v1 prerelease publication — completed section Bounded v1 prerelease publication — completed L1–94
+ Exact published identity section Exact published identity L19–34
+ Executed sequence and verification section Executed sequence and verification L35–66
+ Preserved state and remaining work section Preserved state and remaining work L67–94
+ 1 section Install and roll back Overseer Kit v1.0.0-rc.1 L1–200
+ Git-only source installation section Git-only source installation L14–77
+ Optional Muse runtime and explicit adoption section Optional Muse runtime and explicit adoption L78–147
+ Update and roll back at the same physical kit path section Update and roll back at the same physical kit path L148–200
+ 1 — bounded CLI release candidate section Overseer Kit v1.0.0-rc.1 — bounded CLI release candidate L1–99
+ Assets and documentation section Assets and documentation L89–99
+ Included behavior section Included behavior L20–36
+ Known limits and disposition section Known limits and disposition L66–88
+ Read the companion guide first section Read the companion guide first L55–65
+ Validation already completed section Validation already completed L37–54
+ 1 section Public evidence for v1.0.0-rc.1 L1–57
+ Local evidence deliberately separated section Local evidence deliberately separated L38–57
+ Release and immutable source section Release and immutable source L7–24
+ Retained hosted runs section Retained hosted runs L25–37
~ docs/GIT-ONLY-QUICKSTART.md .md 4 symbols added, 4 symbols removed
− Git-only quickstart (Overseer Kit) section Git-only quickstart (Overseer Kit) L1–39
− Commands section Commands L14–34
− Guardrails section Guardrails L35–39
− Prerequisites section Prerequisites L6–13
+ Git-only quickstart section Git-only quickstart L1–77
+ Explicit kit updates section Explicit kit updates L55–77
+ Initialize an authorized Git checkout section Initialize an authorized Git checkout L13–33
+ Read and publish one handoff section Read and publish one handoff L34–54
~ docs/OVERSEER-HANDOVER.md .md 3 symbols added, 1 symbol modified
+ Operating choices and limits section Operating choices and limits L20–29
+ Published bounded prerelease section Published bounded prerelease L3–19
+ Separate documentation follow-up section Separate documentation follow-up L30–44
~ docs/ROADMAP.md .md 3 symbols added, 1 symbol modified
+ Operating choices and limits section Operating choices and limits L20–29
+ Published bounded prerelease section Published bounded prerelease L3–19
+ Separate documentation follow-up section Separate documentation follow-up L30–44
~ docs/decisions/V1-MUSE-PUBLICATION.md .md 4 symbols added, 11 symbols removed
− Muse-first publication and legacy mirror decision — 2026-10-09 section Muse-first publication and legacy mirror decision — 2026-10-09 L1–346
− Frozen implementation candidate section Frozen implementation candidate L135–149
− Historical local implementation closeout section Historical local implementation closeout L122–134
− Implemented bounded local reconciliation section Implemented bounded local reconciliation L240–283
− Local credential compatibility repair section Local credential compatibility repair L9–57
− Prior owner decision and failed publication attempt section Prior owner decision and failed publication attempt L58–121
− Proposed remote operations for a later owner decision section Proposed remote operations for a later owner decision L284–314
− Retained read-only findings from publication planning section Retained read-only findings from publication planning L184–215
− Reviewed starting candidate and destinations section Reviewed starting candidate and destinations L150–183
− Reviewed starting reconciliation delta section Reviewed starting reconciliation delta L216–239
− Validation and retained boundaries section Validation and retained boundaries L315–346
+ 1 source delivery section Muse-first publication — completed rc.1 source delivery L1–71
+ Completed sequence and evidence limits section Completed sequence and evidence limits L22–51
+ Exact accepted identities section Exact accepted identities L8–21
+ Separate follow-up source section Separate follow-up source L52–71
~ docs/validation/V1-RECOVERY.md .md 13 symbols added, 70 symbols removed
− V1 recovery milestone — verification, 2026-10-08 section V1 recovery milestone — verification, 2026-10-08 L1–2473
− 0 release preparation — 2026-10-08 section 1.0.0 release preparation — 2026-10-08 L604–667
− Authorized DINERO manual pilot — session 4, 2026-10-08 section Authorized DINERO manual pilot — session 4, 2026-10-08 L464–603
− Commands, evidence and NEXT advancement section Commands, evidence and NEXT advancement L538–584
− Preservation and checks section Preservation and checks L494–537
− Scope at completion section Scope at completion L585–603
− Clean source installation and rollback — session 3, 2026-10-08 section Clean source installation and rollback — session 3, 2026-10-08 L331–463
− Disposition and limits section Disposition and limits L427–463
− Exact commands and retained evidence section Exact commands and retained evidence L385–426
− Clean-base results before implementation section Clean-base results before implementation L55–82
− Hosted CI authorization preparation — 2026-10-09 section Hosted CI authorization preparation — 2026-10-09 L1947–1988
− Hosted CI execution — 2026-10-09 section Hosted CI execution — 2026-10-09 L2015–2130
− Closeout and remaining gates section Closeout and remaining gates L2100–2130
− Hosted results and local source agreement section Hosted results and local source agreement L2063–2099
− Hosting destination selection — 2026-10-09 section Hosting destination selection — 2026-10-09 L1989–2014
− Implementation results section Implementation results L109–149
− Independent architecture and completed-build review — session 2, 2026-10-08 section Independent architecture and completed-build review — session 2, 2026-10-08 L167–330
− Additional independent verification of the same action — 2026-10-08 section Additional independent verification of the same action — 2026-10-08 L247–284
− Findings corrected; repeated review action closed — 2026-10-08 section Findings corrected; repeated review action closed — 2026-10-08 L285–330
− Same-action recheck — 2026-10-08 section Same-action recheck — 2026-10-08 L228–246
− Limits and next action section Limits and next action L150–166
− Local credential compatibility repair — 2026-10-09 section Local credential compatibility repair — 2026-10-09 L2384–2473
− Candidate reconciliation and preserved boundaries section Candidate reconciliation and preserved boundaries L2446–2473
− Repair and regression evidence section Repair and regression evidence L2397–2445
− Local legacy-mirror reconciliation — 2026-10-09 section Local legacy-mirror reconciliation — 2026-10-09 L2243–2383
− Actual local results and corrections section Actual local results and corrections L2300–2349
− Changed behavior and fixture evidence section Changed behavior and fixture evidence L2258–2299
− Final candidate, source agreement and preservation section Final candidate, source agreement and preservation L2350–2383
− Muse artifact and CI readiness — 2026-10-08 section Muse artifact and CI readiness — 2026-10-08 L1780–1946
− Exact recovered artifact and provenance section Exact recovered artifact and provenance L1791–1833
− Exact supported results section Exact supported results L1856–1899
− Fresh installation and CI contract section Fresh installation and CI contract L1834–1855
− Source agreement, preservation and remaining authorization section Source agreement, preservation and remaining authorization L1900–1946
− Muse publication planning — 2026-10-09 section Muse publication planning — 2026-10-09 L2131–2242
− New delivery gap and recommendation section New delivery gap and recommendation L2191–2207
− Observations and reconciliation section Observations and reconciliation L2149–2190
− Retained results and preservation section Retained results and preservation L2208–2242
− MuseHub restoration audit — 2026-10-08 section MuseHub restoration audit — 2026-10-08 L668–1098
− Actual infrastructure and remote state section Actual infrastructure and remote state L719–769
− Audit closeout checks section Audit closeout checks L1059–1098
− Audit commands and results section Audit commands and results L1014–1058
− Code-understanding value: verified versus proposed section Code-understanding value: verified versus proposed L919–943
− Current and proposed architecture section Current and proposed architecture L770–806
− Feature disposition and adoption section Feature disposition and adoption L880–918
− Findings and corrections section Findings and corrections L807–839
− Identity, preservation, and evidence classes class section Identity, preservation, and evidence classes L692–718
− Minimal authority, identity, and handoff contract section Minimal authority, identity, and handoff contract L840–879
− Ordered restoration plan and acceptance section Ordered restoration plan and acceptance L944–968
− Session cap and next decision section Session cap and next decision L988–1013
− Test matrix and remaining unknowns section Test matrix and remaining unknowns L969–987
− Verdict and scope correction section Verdict and scope correction L670–691
− Owner clarification and R1 handoff — 2026-10-08 section Owner clarification and R1 handoff — 2026-10-08 L1099–1154
− Preservation and base section Preservation and base L23–54
− R1 optional local Muse handoffs and adoption — 2026-10-08 section R1 optional local Muse handoffs and adoption — 2026-10-08 L1155–1353
− Commands, corrections and exact results section Commands, corrections and exact results L1252–1317
− Identity, implementation and runtime section Identity, implementation and runtime L1165–1216
− Preservation, limits and handoff section Preservation, limits and handoff L1318–1353
− Reviewed exclusion and adoption policy section Reviewed exclusion and adoption policy L1217–1251
− R2 controlled mirror preparation and retry — 2026-10-08 section R2 controlled mirror preparation and retry — 2026-10-08 L1354–1549
− Commands and exact local results section Commands and exact local results L1444–1515
− Identity and implementation section Identity and implementation L1362–1405
− Preservation, limits and next milestone section Preservation, limits and next milestone L1516–1549
− Projection, correspondence and retry contract section Projection, correspondence and retry contract L1406–1443
− R3 isolated source and combined validation — 2026-10-08 section R3 isolated source and combined validation — 2026-10-08 L1550–1779
− Exact test results and corrections section Exact test results and corrections L1702–1748
− Fresh installation, CI and manual rollback section Fresh installation, CI and manual rollback L1648–1701
− Identity and retained staging reconciliation section Identity and retained staging reconciliation L1558–1620
− Independent review and runtime correction section Independent review and runtime correction L1621–1647
− Preservation, limits and actual next action section Preservation, limits and actual next action L1749–1779
− Supported v1 release matrix section Supported v1 release matrix L83–108
+ Bounded v1 recovery — public validation closeout section Bounded v1 recovery — public validation closeout L1–143
+ Declared limits section Declared limits L132–143
+ Earlier reviews, installation and pilot section Earlier reviews, installation and pilot L33–49
+ GitHub acceptance — owner confirmed section GitHub acceptance — owner confirmed L117–124
+ Historical baseline failures section Historical baseline failures L50–59
+ Hosted CI execution — 2026-10-09 section Hosted CI execution — 2026-10-09 L92–98
+ Local credential compatibility repair — 2026-10-09 section Local credential compatibility repair — 2026-10-09 L99–107
+ Muse artifact and CI readiness — 2026-10-08 section Muse artifact and CI readiness — 2026-10-08 L82–91
+ MuseHub restoration audit — 2026-10-08 section MuseHub restoration audit — 2026-10-08 L60–73
+ Prerelease published — 2026-10-09 section Prerelease published — 2026-10-09 L125–131
+ R2 controlled mirror preparation and retry — 2026-10-08 section R2 controlled mirror preparation and retry — 2026-10-08 L74–81
+ Repaired candidate live publication — 2026-10-09 section Repaired candidate live publication — 2026-10-09 L108–116
+ Supported v1 release matrix section Supported v1 release matrix L8–32
Files Changed
+4 ~8
865 in snapshot
← Older Oldest on docs/v1-publication-closeout
All commits
Newer → Latest on docs/v1-publication-closeout

0 comments

No comments yet. Be the first to start the discussion.

To add a comment, use the Muse CLI: muse hub commit comment sha256:f88ec0083b3bcac6a4b7b99c8cc196194ef376aab2c4f2f63e8dfe26256ac6b7 --body "your comment"