TRACK-O-STAGE3-UPGRADE-OPERATOR-RUNBOOK.md markdown
112 lines 3.9 KB
Raw
sha256:a78e7e5a8740e03315f325d19edeb3aa1b306b3337d04abbaa9a9e0f3bbeb7a1 docs: MuseHub-first before ISR #74 — staging solidify NEXT Human 1 day ago

Track O — Stage 3 upgrade operator runbook

Operator path for muse-onlymuse+git-mirror using the kit ceremony orchestrator. Ground truth: frozen docs/archive/phases/PHASE-TRACK-O-O2-STAGE3-UPGRADE-CEREMONY.md (§O2.3–§O2.7).

This is not product unlock. Product Stage 3 one-click may wrap only ok upgrade-regime after Track O / O3 build-verification → pass and the §O2.6 checklist (explicit C6 consent; never auto C8).

Hard stops:

  • Never edit only vcs.regime in .overseer/config.yaml
  • Never muse bridge git-export --git-dir .
  • Never git push <remote> <main_branch>
  • Never merge muse-mirrormain without Tier-3 authorization (C8)
  • No live consumer ok init from this runbook

Prerequisites (C0)

Check Notes
Existing .overseer/config.yaml with vcs.regime: muse-only (or incomplete muse+git-mirror for repair) Wrong start (git-only / missing) → refuse; use greenfield ok init or a later freeze
Muse substrate usable for the tree Required for later live bridge
muse on PATH For C7 only
Empty GitHub repo + git remote add for vcs.git.remote Product/operator work before C7; enforced by G8

Work on a feature branch.


Ceremony (C1–C8)

Step What Writes?
C1 Start-state gate (muse-only / complete / incomplete repair / refuse) No
C2 Complete VCS write preserving docs.* / repo.* Config
C3 Footprint re-seed (ok sync composition) Bridge files + lock
C4 Footprint present in lock + disk No
C5 Bridge dry-run gates G1–G8 (no live export) No
C6 Explicit consent before live No
C7 First live bridge via ./scripts/muse-bridge-deploy.sh Mirror + muse-mirror
C8 Merge PR → main Tier 3 — stop

Commands

Dry-run (default; product wrappers until live)

./cli/ok -C <repo> upgrade-regime --from muse-only --to muse+git-mirror --dry-run --json

Runs C0–C5 planning + G1–G8 report. Sets ready_for_live_bridge: true only when all of G1–G8 pass. If G8 fails, footprint gates may still be OK separately.

Apply (config + footprint; no live bridge)

./cli/ok -C <repo> upgrade-regime --from muse-only --to muse+git-mirror --apply

Performs C2–C4 writes and C5 gates. Does not run C7 unless --live-bridge is also set.

Shared-asset conflict on hand-tuned bridge files → exit 4 without --force. With explicit consent:

./cli/ok -C <repo> upgrade-regime --from muse-only --to muse+git-mirror --apply --force

--force never implies --include-preserved (living docs stay preserved).

./cli/ok -C <repo> upgrade-regime --from muse-only --to muse+git-mirror --apply --live-bridge -y

Requires G1–G8 pass and -y / --yes. Refuse --yes alone without gate success. C7 failure does not auto-revert config/footprint to muse-only.

Idempotent re-run

Already muse+git-mirror with bridge footprint OK → exit 0, no rewrite.

Incomplete upgrade repair

Already muse+git-mirror but bridge files missing/mismatched → skip C2 when VCS already complete; continue C3–C5.


After C5 / C7

  1. Confirm ok status --check-footprint.
  2. Open/update PR muse-mirrormain when gh available (deploy script does this).
  3. Stop before merge — C8 is Tier 3.

Day-to-day publish remains: feature work → safe bridge → PR, never push canonical main.


Cross-references

  • Freeze: docs/archive/phases/PHASE-TRACK-O-O2-STAGE3-UPGRADE-CEREMONY.md
  • Product contract: docs/TRACK-O-NORMIE-CUSTODY-PRODUCT-CONTRACT.md
  • K7 dogfood: docs/archive/phases/PHASE-K7-MUSE-GIT-MIRROR-DOGFOOD.md / docs/K7-DOGFOOD-OPERATOR-RUNBOOK.md
  • Funnel: docs/archive/phases/PHASE-TRACK-O-O0-NORMIE-CUSTODY-FUNNEL.md §O0.3.3
File History 1 commit
sha256:a78e7e5a8740e03315f325d19edeb3aa1b306b3337d04abbaa9a9e0f3bbeb7a1 docs: MuseHub-first before ISR #74 — staging solidify NEXT Human 1 day ago