new-engineer.md
markdown
sha256:8915fe406161f95c1681f9469375e7bae5b28c884f00bedbdef65e4b0cd0738d
docs(flow): commit FLOW-V0-SPEC.md hygiene for 7A-INT merge
Human
16 hours ago
title: Onboarding checklist — new engineer project: engineering-team-template tags:
- onboarding
- checklist
- engineering date: 2026-04-07
Onboarding checklist — new engineer
Buddy: assign on day 1 | Manager: schedule 30-60-90 check-ins
Before day 1 (manager)
- [ ] Laptop and Yubikey shipped or desk ready
- [ ] SSO, email, chat, code host, PagerDuty (if applicable) groups provisioned
- [ ] First ticket picked: small, merged same week
Day 1
- [ ] Complete security and code of conduct training
- [ ] Clone main service repo; run docker compose (or documented dev env) successfully
- [ ] Join team ceremonies; add timezone and working hours to profile
Week 1
- [ ] Ship a docs fix or test improvement PR to learn the release path
- [ ] Read latest ADR for your primary codebase
- [ ] Shadow on-call primary for two hours (non-production incidents only if possible)
- [ ] Schedule 1:1s with PM and design partner for your squad
Week 2–4
- [ ] Ship a small feature E2E with buddy review; fix runbook gaps you hit; give a 5-minute lightning talk.
Ongoing
Light worklog (shipped / blocked / needs); small PRs; surface requirement conflicts early. Sign HR acknowledgements in the official tool—this file is your working copy.
File History
1 commit
sha256:8915fe406161f95c1681f9469375e7bae5b28c884f00bedbdef65e4b0cd0738d
docs(flow): commit FLOW-V0-SPEC.md hygiene for 7A-INT merge
Human
16 hours ago