# aaronrene — component dev work queue ## Purpose Master tracker for tickets handed off to **aaronrene** (component dev, `write` collaborator on `gabriel/musehub`). Every ticket assigned to him should be linked here as a child, in the order he's expected to pick them up. This issue doesn't contain implementation detail itself — each child issue is fully specced on its own; this is just the queue + a single place to see his overall assignment load and sequencing. ## Why a queue instead of assigning everything at once Most of the backlog below is already thoroughly specced (phases, ASCII mockups, acceptance criteria) and safe to hand off outright — aaronrene has already shown he can pick up a fully-specced ticket and deliver (musehub#84's two-column scroll fix, reviewed and shipped this cycle, plus the proposal-permissions bug he surfaced organically). The queue exists so we hand off one (or a small batch) at a time instead of dumping the entire backlog on him — easier to review, easier to reprioritize if something more urgent lands. ## Active - [ ] #129 — Rich social preview cards for repo links (no dynamic OG image today). Assigned. See that issue for full phase breakdown (design → implement `/opengraph-image` endpoint → wire into repo pages + verify on a real platform debugger). ## Candidate follow-ups (not yet assigned) Not committed yet — listed here so the next hand-off doesn't require re-triaging the backlog from scratch. All are GUI-heavy, already have detailed specs (several with ASCII layout mockups), and don't require deep familiarity with Muse's core VCS internals: - #24 — Symbol Detail Page — God-Tier Redesign - #25 — Symbols Page v2 — Symbol-First Intelligence Browser - #32 — Releases List: Version History Mission Control - #33 — Release Page: Semantic Version Observatory - #34 — Issues List: Codebase Intelligence Mission Control ## Handoff convention - One child ticket assigned at a time (or a tightly related small batch), not the whole candidate list. - Each child ticket must already have: background/root-cause, explicit goal, phase breakdown, and acceptance criteria before being assigned — if a candidate isn't at that bar yet, spec it further here first. - When a child ticket ships, check it off here and note the shipping commit/proposal.